Matrix Engineering provided the electrical design and implementation for an Auxiliary Power system for the Paducah McCracken Joint Sewer Agency Reidland WWTP. A new 250kW (480V, 3-Phase) auxiliary power generator was installed to provide continuous operation of the WWTP during power outages. We were responsible for incorporating the new generator into the existing MCC via an automatic transfer switch. This diesel fuel auxiliary powered generator was sized to run the plant for 24 hours following an interruption in power.