Matrix Engineering performed the mechanical and electrical engineering as well as oversight of the combustion engineering for a burner and fuel train upgrade for their natural gas boiler. The project objective was to bring the boiler in compliance with NPPA 85 guidelines.
Matrix Engineering provided the civil/structural and mechanical/piping detailed engineering necessary for installing a new skid boiler at ISP in Calvert City, KY.
Matrix Engineering performed the mechanical and electrical engineering for process piping and instrumentation required for a new 5,000 gal de-aerator tank for a steam production of 200,000 lb/hr.
Matrix Engineering provided the civil/structural and mechanical engineering necessary for repairing and refurbishing an existing boiler for service at ISP Chemicals in Calvert City.
Matrix Engineering provided the mechanical and process design for the installation of a replacement boiler for the Paducah McCracken Joint Sewer Agency.
Matrix Engineering performed the piping design and instrumentation loops for redundant level control on two different boilers for ISP Chemicals in Calvert City.
Matrix provided the civil, structural, mechanical, electrical and controls engineering for a water softener system supplying the boilers at the Nashville, Tennessee facility. The system consisted of a packaged softener system and two brine tanks. Special considerations were made in the concrete design due to the strong salt water issues. PVC piping was used along with heat tracing for freeze protection. Matrix also integrated the controls between the packaged softener system and the brine pumping system.