Matrix Engineering performed the mechanical and electrical engineering as well as oversight of the combustion engineering for a burner and fuel train upgrade for their natural gas boiler. The project objective was to bring the boiler in compliance with NPPA 85 guidelines with the addition of flame scanners and new ignitors. Matrix worked with Kiln Flame Systems (now METSO) on the combustion engineering design portion of the project.