TEMPORARY RENTAL BOILER IMPLEMENTATION

December 1, 2011

Matrix Engineering provided the civil/structural and mechanical engineering necessary for installing a new skid boiler at ISP.  We initially provided the piping design for the boiler feed water and steam outflow of the boiler when it was initially brought in for an emergency. Once the decision was made to keep the boiler on hand for an extended period, Matrix was chosen to provide more suitable concrete foundation and dedicated access platforms.