DEWATERING BUILDING VENTILATION

November 1, 2005
The Paducah McCracken Joint Sewer Agency asked us to provide engineering assistance to eliminate a problem with hydrogen sulfide gas in their dewatering building. The issue was caused by in-adequate ventilation resulting in noxious fumes and extreme corrosion within the building. Matrix replaced their existing ventilation system and provided hoods specifically designed for each piece of equipment in the building. The hoods were designed to adequately ventilate yet allow room for cleaning and maintaining of the dewatering equipment. The Director of the JSA informed us that our design helped the interior smell like “pristine mountain air” compared to the old system.

More Projects & News

MATRIX TUGMONITOR is a high end engine monitoring and alarm system that is simple to add alarms to.
January 26, 2024
Matrix provides a PLC based TUGMONITOR for a 6000HP TWIN ENGINE NEW BUILD. Communicates seamlessly via ethernet with GE Engines.
By Darren Jarvis November 1, 2022
CORROSIVE / COMBUSTIBLE IODINE DUST
By Darren Jarvis October 31, 2022
CLASS I AREA PLC CONTROLS
Show More
Share by: