MATRIX PROJECTS

WWTP & Lift Station Replacement with SCADA System - City of LaCenter

February 1, 2012

Matrix Engineering provided the electrical design, supply and implementation of (2) control systems for the city of La Center KY’s Eastside and Broadway wastewater lift stations. Each control system operated a wet well with HP duplex pumps, level control and flowmeter. Each station was equipped with an HMI for operator interface as well as a data recorder to track and log the operating history of the lift station. A refrigerated composite sampler was also integrated which allowed operators to monitor pH/temperature and dissolved oxygen levels in the effluent.  Matrix also provided an AB Factory Talk View SCADA system was installed to monitor operating and flow conditions at the Eastside and Broadway lift stations through radio communication. 


More Projects & News

MATRIX TUGMONITOR is a high end engine monitoring and alarm system that is simple to add alarms to.
January 26, 2024
Matrix provides a PLC based TUGMONITOR for a 6000HP TWIN ENGINE NEW BUILD. Communicates seamlessly via ethernet with GE Engines.
By Darren Jarvis November 1, 2022
CORROSIVE / COMBUSTIBLE IODINE DUST
By Darren Jarvis October 31, 2022
CLASS I AREA PLC CONTROLS
Show More
Share by: