MATRIX PROJECTS

LEAVENING POWDER AIR BLENDING DENSE PHASE CONVEYING

March 1, 2004
Matrix provided the structural, mechanical and electrical engineering required for the production of a new leavening powder in an existing process. Major modifications were required to an existing air blending and conveying system and a new separate dust collection system was required to avoid cross contamination between the different products. The dust collection systems for these products was very sophisticated. Simultaneous operation was required for on both collectors for the packaging of one product while another was being produced. This simultaneous operation had to be accomplished with cross contamination adding a high element of complexity to the control system. Matrix provided the engineering for a new control system for the blending, conveying, packaging & dust control system. Matrix also provided total commissioning/start-up support for this system.

There were also considerable spatial constraints for introducing this new product to a well established process area.  However, we were able to squeeze our new production surge hopper between existing storage and packaging bin to utilize existing blending and dense phase systems.

More Projects & News

MATRIX TUGMONITOR is a high end engine monitoring and alarm system that is simple to add alarms to.
January 26, 2024
Matrix provides a PLC based TUGMONITOR for a 6000HP TWIN ENGINE NEW BUILD. Communicates seamlessly via ethernet with GE Engines.
By Darren Jarvis November 1, 2022
CORROSIVE / COMBUSTIBLE IODINE DUST
By Darren Jarvis October 31, 2022
CLASS I AREA PLC CONTROLS
Show More
Share by: