MATRIX PROJECTS

LIFT STATION – ELECTRICAL RENOVATION & GENSET

November 25, 2007
Our engineers provided electrical and controls engineering necessary to change out the existing electrical service, motor control center, and control system for the Paducah McCracken Joint Sewer Agency. We provided engineering and equipment necessary to provide temporary power and controls during construction to minimize downtime. Matrix also provided all PLC programming as well as construction management and startup services. In addition to the controls, Matrix also re-designed the en try of waste into the station and added a Muffin Monster.

More Projects & News

MATRIX TUGMONITOR is a high end engine monitoring and alarm system that is simple to add alarms to.
January 26, 2024
Matrix provides a PLC based TUGMONITOR for a 6000HP TWIN ENGINE NEW BUILD. Communicates seamlessly via ethernet with GE Engines.
By Darren Jarvis November 1, 2022
CORROSIVE / COMBUSTIBLE IODINE DUST
By Darren Jarvis October 31, 2022
CLASS I AREA PLC CONTROLS
Show More
Share by: