Our engineers provided electrical and controls engineering necessary to change out the existing electrical service, motor control center, and control system for the Paducah McCracken Joint Sewer Agency. We provided engineering and equipment necessary to provide temporary power and controls during construction to minimize downtime. Matrix also provided all PLC programming as well as construction management and startup services. In addition to the controls, Matrix also re-designed the entry of waste into the station and added a Muffin Monster.