Matrix Engineering performed the mechanical and electrical design for the relocation for an existing steam spray dryer head tank. The modification included relocating a new 250 gallon non-pressurized vessel, which was suspended from the ceiling in order to create more floor space for other new equipment. We provided high level instrumentation, a steam control valve, and level transmitting device, which were all tied back into the plant’s DCS system for monitoring. Through this project we were able to provide ISP a larger feed volume of de-ionized water to their steam dryer and level indication through new instrumentation, which led to a more efficient operation of the unit.